New Study quantifies the carbon impact of Cat A fit out 12.03.24

AHMM has published a new study, titled ‘Fit Out – Rip Out’, which aims to quantify the potential carbon impact of Cat A fit out in commercial office buildings. The report challenges an industry standard approach to the design, construction, and marketing of speculative office space, and examines whole life carbon impact of Cat A fit out related to tenant lease cycles.

Dr Craig Robertson, Head of Sustainability at AHMM said: “AHMM’s Building Performance Team carries out analysis on all aspects of the buildings we design, and central to our role is sharing knowledge across the different project teams. Internal discussions and images of brand new Cat A materials being ripped out and discarded prompted us to start investigating the carbon impact of Cat A fit out.

This report outlines the drivers of the process and, for the first time, quantifies the potential impacts in both upfront and life cycle carbon terms. The data from our study illustrates the scale of the problem, and by sharing these findings beyond AHMM we hope to provoke conversations across our industry that lead to meaningful change in the way that we develop, market, and occupy our office buildings that responds to the climate emergency.”

To read more about the research and download the report please visit here.

 
 
Link Date Title Location
26.04.24 1 Broadgate Tops Out 1 Broadgate date240426
26.04.24 Belgrove House Building Study Tour Belgrove House date240426
18.04.24 Claire Pollock awarded RIBA Honorary Fellowship date240418
15.04.24 Construction commences on Phase 2 of the Television Centre Television Centre Masterplan date240415
12.04.24 The Chartered Institute of Building Award 2024 One Great Cumberland Place date240412
11.04.24 London Square Bermondsey shortlisted for a 2024 Housing Design Award London Square Bermondsey date240411
23.04.24 AIA Central Oklahoma Architecture Awards 2024 The Icehouse District Wheeler Residential Flamingo Tiki date240423
02.04.24 Taxi House Tops Out Taxi House date240402
25.03.24 Tower Hamlets Town Hall wins Civic Trust Award Tower Hamlets Town Hall date240325
21.03.24 Pineapple Awards 2024 Shortlist Tower Hamlets Town Hall Magna Square Soho Place date240321
18.03.24 The Professional NBA Arena Locker Room officially open Professional NBA Arena Locker Room date240318
11.03.24 Tower Hamlets Town Hall Shortlisted for a 2024 RICS Award Tower Hamlets Town Hall date240311
12.03.24 New Study quantifies the carbon impact of Cat A fit out date240312
08.03.24 The Arc officially opens The Arc date240308
06.03.24 Elderberry Walk Officially Opens Elderberry Walk date240306
01.03.24 Cycle to MIPIM 2024 date240301
28.02.24 Angel Square Site Progress Angel Square date240228
27.02.24 Narrative Practice Sessions x AHMM date240227
27.02.24 45 Beech Street submitted for planning date240227
22.02.24 RIBA North West Region Award Shortlist The Alder Centre date240222
20.02.24 RIBA South East Award Shortlist Magna Square date240220
15.02.24 Lansdowne House breaks ground Lansdowne House date240215
15.02.24 RIBA London region Award shortlist 10 Lewis Cubitt Square Montacute Yards The Rowe date240215
14.02.24 National Apprenticeships Week 2024 date240214
12.02.24 RIBA South West + Wessex region Award shortlist One Portwall Square date240212
31.01.24 1 Riva Row, Houston Texas, Site Progress 1 Riva Row date240131
29.01.24 AHMM shortlisted for LSE’s Bankside House redevelopment design competition date240129
17.01.24 Illumanate Competition date240117
12.01.24 Riga Competition date240112
08.01.24 Review of 2023 Burntwood School University of Amsterdam White Collar Factory Tower Hamlets Town Hall 1 New Park Square date240108

Allford
Hall
Monaghan
Morris